Network Rail's combined engineering depot at Ashford has undergone a £3M refurbishment. Airtemp were commissioned to design and deliver an air conditioning and ventilation system to serve the up to date needs of the Network Rail staff.

Office fit out

A Daikin VRV system was installed in the office area along with heat recovery ventilation and toilet and kitchen extract systems.

Results:

Airtemp worked closely with the main contractor and the client to deliver successfully and on time. This was delivered within the 16 week time frame and with a budget of £275,000.