The project design was based around the unique location of the premises and the challenges it presented. Airtemp successfully delivered on a strict project completion time frame of 12 weeks.
Design and Build
A high quality gym space with a modern look, set within a prestigious building situated on the promenade and looking out to sea. This project consisted of a full installation of mechanical, ventilation, air conditioning and associated controls. All air conditioning and ductwork services were designed by our in-house design team.
Results:
All works were completed and handed over within a 12 week time frame including working within budget of £94,750.